Academic
Professional
Competitions
Web Stuff
Life
 

Dominican Santa Cruz Hospital Administration Annex

Gordon H Chong & Partners

The Adiminstration Annex is a 9,0000 sq. ft. replacement Administration Building attached to an existing concrete chapel at Dominican Santa Cruz Hospital. The project foucs was to respond to the site and exisiting conditions through materials and form, such as creating a plnth of matching concrete to the Chapel, using the skew of the chapel in a differenet elevational plane via the roof eave, and responding to the public edge differenlty than to the private edge using a corner piece of conrete for the transistion.

This project was designed with models and sketches. Final presentation was drawn via Autocad.

 

 

 

 

 

.................................................................